Error
  • JUser: :_load: Unable to load user with ID: 44
  • JUser: :_load: Unable to load user with ID: 45
  • JUser: :_load: Unable to load user with ID: 46
  • JUser: :_load: Unable to load user with ID: 47
FAROP Key Personnel
Peter Fuller

Peter worked for BHPBilliton from 1988 to 2006 in Engineering, Production and Project Management roles. Peter gained experience in Base Metals mineral processing, Manganese Submerged Arc Furnaces, Coal Processing and Mining operations before moving into the Business Improvement Arena (Lean Six Sigma).

More about: Peter Fuller

Case Studies

Concrete Feeder Protection - Coal Feed Stockpile

Project Summary An existing ARMCO tunnel and Coal feeder concrete structures were found to have str

more info
Mine Site Water Management

Project Summary Coal Mine - Major Dewatering Strategy; Poly pipe supply and installation.

more info
Gravel Screening Trial

Project Summary Coal Mine - Gravel and rock screening trial.

more info
Mine Car Park Upgrade

Project Summary Coal Mine - Car Park upgrade.

more info
Replacement of Gantries and Trestles

Project Summary Replacement of 6 Trestles and 2 Gantries on elevated conveyer structures.

more info