Category: Electrical Projects
Print

Project Summary

Blackwater Mine - Ramp 32 Power Dragline Power Supply Upgrade.

 

Power Dragline Power Supply Project
Power Dragline Power Supply Project

Project Brief

Current Power lines and Substation to be relocation in order for mining operations to continue.

Requirements

  • 66/6.6kV power lines and Substation 38 relocation allowing continued operations of the R32 pit
  • Scope to include the installation of a new stubline extended from ABS 55 and relocation / upgrade of Substation 38
  • Capitol Budget of A$2.1 million

Deliverables

  • Retraction of 3km of reduction 66/6.6kV Power lines
  • Installation of a new 700m, 66kV Stubline with underground road crossing and transportable mining substation earth mat
  • Relocation of a fixed 66/6.6kV fixed substation including new concrete bund, earth mat and modifications to make the substation compliant to Australian Standards

Business Outcomes

  • Successful project completion, under budget and on time
  • Zero incidents or impact to mine operations

Case Studies

Gravel Screening Trial

Project Summary Coal Mine - Gravel and rock screening trial.

more info
New Launder for Thickener

Project Summary Installation of a new Launder for Thickener - Coal Processing Plant.

more info
Work-Pac-4 - Increased Coal Production

Project Summary The CHPP was losing coal due to poor floatation performance - New pumps and Sumps r

more info
Replacement of Gantries and Trestles

Project Summary Replacement of 6 Trestles and 2 Gantries on elevated conveyer structures.

more info
Tailings Dam Construction

Project Summary Metalliferous Mine - Tailings Dam Construction and Filter Wall.

more info