Category: Electrical Projects
Print

Project Summary

Blackwater Mine - Ramp 32 Power Dragline Power Supply Upgrade.

 

Power Dragline Power Supply Project
Power Dragline Power Supply Project

Project Brief

Current Power lines and Substation to be relocation in order for mining operations to continue.

Requirements

  • 66/6.6kV power lines and Substation 38 relocation allowing continued operations of the R32 pit
  • Scope to include the installation of a new stubline extended from ABS 55 and relocation / upgrade of Substation 38
  • Capitol Budget of A$2.1 million

Deliverables

  • Retraction of 3km of reduction 66/6.6kV Power lines
  • Installation of a new 700m, 66kV Stubline with underground road crossing and transportable mining substation earth mat
  • Relocation of a fixed 66/6.6kV fixed substation including new concrete bund, earth mat and modifications to make the substation compliant to Australian Standards

Business Outcomes

  • Successful project completion, under budget and on time
  • Zero incidents or impact to mine operations

Case Studies

Transportable Mining Substation Upgrade

Project Summary Coal Mine - Transportable Mining Substation Upgrade.

more info
Mine Water Fill-Point Upgrade

Project Summary Coal Mine - Mine Water Fill-Point Upgrade.

more info
Major Haul Road Culvert Upgrade

Project Summary Coal Mine - Major Haul Road Culvert Upgrade.

more info
Concrete Feeder Protection - Coal Feed Stockpile

Project Summary An existing ARMCO tunnel and Coal feeder concrete structures were found to have str

more info
Gravel Screening Trial

Project Summary Coal Mine - Gravel and rock screening trial.

more info