Development of Activities aligned to optimizing the Resource in terms of recovery, cost and mining at maximum production rates.

Development and Execution of Projects aligned to Organic Growth and Improvement – Same Equipment , More Tonnes

 

FAROP Specialist mining services and activities;

  • Mine Planning and Mine Design
  • Organic Growth and Optimisation Projects – Same Equipment , More Tonnes
  • Mining Engineering Professional Placements

Recently delivered Mining Projects;

  • Increased Coal Recovery – 4% increase
  • Stripping volumes – 20% increase in BCM’s , no increase in Machinery
  • Mining Tonnes per day – 10 % increase in Production Rates
  • Water Inundation, rapid recovery back to mining
  • Haul Road Design and Construction
  • Water Management Strategy activities

Case Studies

New Concrete Tunnel - train load out structural bypass

Project Summary Provide a structural bypass solution to the existing Train load out tunnel.

more info
Work-Pac-4 - Increased Coal Production

Project Summary The CHPP was losing coal due to poor floatation performance - New pumps and Sumps r

more info
Mine Water Destruction Processes

Project Summary Coal Mine - Reduction of mine water on site by water destruction processes.

more info
Mine Site Water Management

Project Summary Coal Mine - Major Dewatering Strategy; Poly pipe supply and installation.

more info
New Launder for Thickener

Project Summary Installation of a new Launder for Thickener - Coal Processing Plant.

more info