Water Management Projects

Development and Execution of a Minesite’s Water Management Strategy, initiatives and actions aligned to the key elements of;

  • Rainfall catchment area reduction and pit protection activities
  • Rapid response from Pit inundation and return to production activities
  • Transfer of water across the minesite to long term water storage areas as part of “Normal Operating” mode
 

Recently delivered Water Management Projects;

  • Pit Protection and Catchment reduction activities
  • Catchment analysis and reduction activities
  • Drainage Analysis and design
  • Protection activities - Bunding, Blade ploughing, drains, diversions, etc
  • Construction activities - Drainage , Dams, Sumps
  • Pumping and Piping Project Management - Concept through to execution
  • Water management infrastructure designs
  • Installation of pumps and piping
  • Installation of telemetry and remote activation systems
  • Wet weather recovery after inundation
  • Designs, Infrastructure, staging dams, methods
  • Water Destruction and Disposal activities
  • Irrigation, Fluming, Evaporation ponds, Fixed Sprinklers, Water Fillpoints

Case Studies

Tailings Dam Construction

Project Summary Metalliferous Mine - Tailings Dam Construction and Filter Wall.

more info
New Concrete Tunnel - train load out structural bypass

Project Summary Provide a structural bypass solution to the existing Train load out tunnel.

more info
Gravel Screening Trial

Project Summary Coal Mine - Gravel and rock screening trial.

more info
Stockpile Lighting

Project Summary Manganese Mine - Run of mine Stockpile (Cantilever type) Lighting.

more info
Mine Site Water Management

Project Summary Coal Mine - Major Dewatering Strategy; Poly pipe supply and installation.

more info